|
HOW TO USE PDF FILES: View a file: click the link with the left
mouse button. Download a file: click the link with the right
mouse button, then choose "save target as. |
| Name |
Effective
Date |
Revised
Date |
|
January 16 & March 6, 2009 Check Sheet (236k) |
|
|
|
Accessible Pedestrian Signals (APS) (27k) |
04/01/03 |
01/01/07 |
|
Alkali-Silica Reaction for Cast-in-Place Concrete
(60k) |
08/01/07 |
01/01/09 |
|
Alkali-Silica Reaction for Precast and Precast Prestressed Concrete
(60k) |
01/01/09 |
|
|
Approval of Proposed Borrow Areas, Use
Areas, and/or Waste Areas Inside Illinois State Borders (9k) |
11/01/08 |
|
|
Automated Flagger Assistance Device
(12k) |
01/01/08 |
|
|
Bituminous Materials Cost Adjustments
(22k) |
11/02/06 |
01/02/07 |
|
Building Removal – Case I (Non-Friable and Friable Asbestos)
(34k) |
09/01/90 |
01/01/07 |
|
Building Removal – Case II (Non-Friable Asbestos) (20k)
|
09/01/90 |
01/01/07 |
|
Building Removal – Case III (Friable Asbestos) (19k)
|
09/01/90 |
01/01/07 |
|
Building Removal – Case IV (No Asbestos) (11k) |
09/01/90 |
01/01/07 |
|
Cement (15k) |
01/01/07 |
11/01/07 |
|
Completion Date (via calendar days)
(9k) |
04/01/08 |
|
|
Completion Date (via calendar days) Plus Working Days
(9k) |
04/01/08 |
|
|
Concrete Barrier (9k) |
01/01/08 |
|
|
Concrete Gutter, Type A
(9k) |
01/01/09 |
|
|
Concrete Joint Sealer
(11k) |
01/01/09 |
|
|
Digital Terrain Modeling for Earthwork
Calculations
(11k) |
04/01/07 |
|
|
Disadvantaged Business Enterprise Participation (31k) |
09/01/00 |
11/01/08 |
|
Dowel Bars (8k) |
04/01/07 |
01/01/08 |
|
Engineer’s Field Office Type A (14k) |
04/01/07 |
08/01/08 |
|
Engineer’s Field Office Type B (12k) |
08/01/08 |
|
|
Epoxy Pavement Markings (20k) |
01/01/07 |
|
|
Equipment Rental Rates (11k) |
08/02/07 |
01/02/08 |
|
High Tension Cable Median Barrier
(13k) |
01/01/07 |
|
|
HMA - Hauling on Partially Completed
Full-Depth Pavement (13k) |
01/01/08 |
|
|
Hot-Mix Asphalt – Field Voids in the
Mineral Aggregate (64k) |
04/01/07 |
04/01/08 |
|
Hot-Mix Asphalt - Plant Test Frequency
(63k) |
04/01/08 |
|
|
Hot-Mix Asphalt - Transportation
(10k) |
04/01/08 |
|
|
Hot Mix Asphalt Mixture IL-4.75
(80k) |
11/01/04 |
01/01/08 |
|
Hot Mix Asphalt Mixture IL-9.5L
(10k) |
01/01/08 |
|
|
Impact Attenuators (12k) |
11/01/03 |
11/01/08 |
|
Impact Attenuators, Temporary (13k) |
11/01/03 |
01/01/07 |
|
Mast Arm Assembly and Pole (11k) |
01/01/08 |
01/01/09 |
|
Material Transfer Device (12k) |
06/15/99 |
01/01/09 |
|
Metal Hardware Cast into Concrete
(9k) |
04/01/08 |
11/01/08 |
|
Moisture Cured Urethane Paint System
(25k) |
11/01/06 |
01/01/07 |
|
Multilane Pavement Patching (6k) |
11/01/02 |
|
|
National Pollutant Discharge Elimination
System / Erosion and Sediment Control Deficiency Deduction
(10k) |
04/01/07 |
11/01/08 |
|
Nighttime Work Zone Lighting (14k) |
11/01/08 |
|
|
Notched Wedge Longitudinal Joint (14k) |
07/01/04 |
01/01/07 |
|
Notification of Reduced Width (8k) |
04/01/07 |
|
|
Organic Zinc-Rich Paint System (26k) |
11/01/01 |
01/01/08 |
| Partial
Exit Ramp Closure for Freeway/Expressway (9k) |
01/01/09 |
|
|
Payments to Subcontractors
(45k) |
06/01/00 |
01/01/06 |
|
Personal Protective Equipment (8k) |
11/01/08 |
|
|
Plastic Blockouts for Guardrail (8k) |
11/01/04 |
01/01/07 |
|
Polyurea Pavement Marking (36k) |
04/01/04 |
01/01/09 |
|
Portland Cement Concrete Inlay or
Overlay (14k) |
11/01/08 |
|
|
Portland Cement Concrete Plants
(10k) |
01/01/07 |
|
|
Post Clips for Extruded Aluminum Signs
(9k) |
01/01/09 |
|
|
Precast Handling Holes (11k) |
01/01/07 |
|
|
Preventive Maintenance – Bituminous
Surface Treatment (30k) |
01/01/09 |
|
|
Preventive Maintenance – Cape Seal
(55k) |
01/01/09 |
|
|
Preventive Maintenance – Micro-Surfacing
(45k) |
01/01/09 |
|
|
Preventive Maintenance – Slurry Seal
(41k) |
01/01/09 |
|
|
Prismatic Curb Reflectors (10k) |
11/01/08 |
|
|
Public Convenience and Safety (5k) |
01/01/00 |
|
|
Railroad Protective Liability Insurance (37k) |
12/01/86 |
01/01/06 |
|
Railroad Protective Liability Insurance (5 and 10) (51k) |
01/01/06 |
|
|
Ramp Closure for Freeway/Expressway
(10k) |
01/01/09 |
|
|
Reclaimed Asphalt Pavement (RAP)
(32k) |
01/01/07 |
08/01/07 |
|
Reflective Sheeting on Channelizing
Devices (11k) |
04/01/07 |
11/01/08 |
|
Reinforcement Bars (12k) |
11/01/05 |
01/02/08 |
|
Reinforcement Bars - Storage and
Protection (9k) |
08/01/08 |
|
|
Restoring Bridge Approach Pavements
Using High-Density Foam (16k) |
01/01/09 |
|
|
Retro-reflective Sheeting, Non-reflective
Sheeting, and Translucent Overlay Film for Highway Signs
(36k) |
04/01/07 |
|
|
Seeding(14k)
|
07/01/04 |
01/01/09 |
|
Self-Consolidating Concrete For
Cast-In-Place Construction (19k) |
11/01/05 |
01/01/09 |
|
Self-Consolidating Concrete For Precast Products (11k) |
07/01/04 |
01/01/07 |
| Sign Panels
and Sign Panel Overlays (9k) |
11/01/08 |
|
| Silt Filter
Fence (9k) |
01/01/08 |
|
|
Steel Cost Adjustment
(25k) |
04/02/04 |
04/01/07 |
|
Steel Plate Beam Guardrail
(9k) |
11/01/05 |
08/01/07 |
| Stone
Gradation Testing (9k) |
11/01/07 |
|
|
Subcontractor Mobilization Payments
(68k) |
04/02/05 |
|
|
Surface Testing of Pavements (29k) |
04/01/02 |
01/01/07 |
|
Temporary Erosion Control (10k) |
11/01/02 |
01/01/08 |
|
Temporary Raised Pavement Marker
(10k) |
01/01/09 |
|
|
Thermoplastic Pavement Markings
(19k) |
01/01/07 |
|
|
Training Special Provisions (9k) |
10/15/75 |
|
| Type ZZ
Retro-reflective Sheeting, Non-reflective Sheeting, and
Translucent Overlay Film for Highway Signs (32k) |
04/01/07 |
|
|
Variable Spaced Tining
(11k) |
08/01/05 |
01/01/07 |
|
Working Days (35k) |
01/01/02 |
|
|
Woven Wire Fence (8k) |
04/01/08 |
|
|
Download all Special Provisions
(.pdf file)( 1.3 mb) Technical Support: 217-524-1642 ![null]() |